Webmail | Privacy Policy    

REPAIRS & REHABILITATION

Bridge No 58/1 of NH -2 on River Durgavati

Design Checks for Rehabilitation of 175 m long 6 span continuous Bridge structure in which the couplers failed during stressing operations. Activities involved verifying and ascertaining adequacy of the original design, giving the rehabilitation measures using external prestressing cables with detailed stage wise calculations to know the effects of pre-stress applied and get the same approved. In addition, Spectrum attended to the Implementation of the Sceme at Site including Load Testing.

»Client:  Progressive Construction

»Client:  NHAI

»Back to top

Repair & Rehabilitation of Quay walls (2 Nos.) and a Bridge at Port Mathurin in Mauritius

Project involved repairs and rehabilitation of steel sheet piles of 2 Quay walls and a bridge on Steel piles at Port Mathurin for Mauritius Port Authority, Maritius, Africa.

»Client:  AFCONS Infrastructure Ltd.

»Owner:  Mauritius Port Authority

»Back to top

Repair & Rehabilitation of Quay walls (6 Nos.) at Port Louis in Mauritius

Project involved repairs and rehabilitation of steel sheet piles of 6 Quay walls at Port Louis Harbour for Mauritius Port Authority, Maritius, Africa.

»Client:  AFCONS Infrastructure Ltd.

»Owner:  Mauritius Port Authority

»Back to top

Home | About Us | Services | Resources | Projects | Careers | Contact Us
© 2013 Spectrum Techno Consultants Pvt. Ltd. All rights reserved.